Set brake tester STM-15000U for the plant "Motor-Sich"

Customer: Plant "Motor Sich" Zaporozhye.

Artists: installation crew (3 people), an engineer for connecting and configuring equipment.

Type of work:

1. Mounting cradle-frame for the brake tester STM-15000U.

2. Installing brake tester STM-15000U.

3. Connecting all the equipment for inspection.

4. Training station working on the brake stand and other measuring equipment.

 

Progress you can see in the pictures below.

If you want to view more photos - just click on it.

 

Our craftsmen make room for a frame-lodgement brake tester STM-15000U.


STM-15000U place to-cradle frame.

 

Fine-tuning the level of the cradle using vaservagi.

STM-15000U level adjustment of the cradle.

 

The welding to secure the position of the cradle before concreting.

STM-15000U welding for fixing the position of the cradle.

 

Show formwork lodgement brake tester STM-15000U.

STM-15000U formwork lodgement.

 

Bottom roller units created under the ditch for water drainage and dirt that will fall from the dirty wheels.

STM-15000U ditch to drain water and dirt.

 

Checking the cradle after concreting.

STM-15000U check the position of the cradle.

 

Concreting-cradle frame brake tester STM 15000U completed. Concrete must settle.

STM-15000U concreting-cradle frame completed.

 

Installation of the power unit of the roller brake tester STM-15000U.

STM-15000U installation of the power unit.

 

Final configuration brake tester.

STM-15000U the final configuration.

 

Brake stand installed. Customer completely satisfied.


Customer completely satisfied.

 

Communicating factory "Motor Sich".

Communicating factory «Motor Sich».

Photos: Set brake tester STM-15000U for the plant "Motor-Sich"

Customer completely satisfied.
Customer completely satisfied.
Communicating factory «Motor Sich».
Communicating factory «Motor Sich».
STM-15000U place to-cradle frame.
STM-15000U place to-cradle frame.
STM-15000U level adjustment of the cradle.
STM-15000U level adjustment of the cradle.
STM-15000U welding for fixing the position of the cradle.
STM-15000U welding for fixing the position of the cradle.
STM-15000U formwork lodgement.
STM-15000U formwork lodgement.
STM-15000U ditch to drain water and dirt.
STM-15000U ditch to drain water and dirt.
STM-15000U check the position of the cradle.
STM-15000U check the position of the cradle.
STM-15000U concreting-cradle frame completed.
STM-15000U concreting-cradle frame completed.
STM-15000U installation of the power unit.
STM-15000U installation of the power unit.
STM-15000U the final configuration.
STM-15000U the final configuration.