Set brake tester STM-15000U for the plant "Motor-Sich"

Customer: Plant "Motor Sich" Zaporozhye.

Artists: installation crew (3 people), an engineer for connecting and configuring equipment.

Type of work:

1. Mounting cradle-frame for the brake tester STM-15000U.

2. Installing brake tester STM-15000U.

3. Connecting all the equipment for inspection.

4. Training station working on the brake stand and other measuring equipment.

Due Date: July-August 2010.

 

Progress you can see in the pictures below.

If you want to view more photos - just click on it.

 

Our craftsmen make room for a frame-lodgement brake tester STM-15000U.


STM-15000U place to-cradle frame.

 

Fine-tuning the level of the cradle using vaservagi.

STM-15000U level adjustment of the cradle.

 

The welding to secure the position of the cradle before concreting.

STM-15000U welding for fixing the position of the cradle.

 

Show formwork lodgement brake tester STM-15000U.

STM-15000U formwork lodgement.

 

Bottom roller units created under the ditch for water drainage and dirt that will fall from the dirty wheels.

STM-15000U ditch to drain water and dirt.

 

Checking the cradle after concreting.

STM-15000U check the position of the cradle.

 

Concreting-cradle frame brake tester STM 15000U completed. Concrete must settle.

STM-15000U concreting-cradle frame completed.

 

Installation of the power unit of the roller brake tester STM-15000U.

STM-15000U installation of the power unit.

 

Final configuration brake tester.

STM-15000U the final configuration.

 

Brake stand installed. Customer completely satisfied.


Customer completely satisfied.

 

Communicating factory "Motor Sich".

Communicating factory «Motor Sich».

Photos: Set brake tester STM-15000U for the plant "Motor-Sich"

Communicating factory «Motor Sich».
Communicating factory «Motor Sich».
STM-15000U place to-cradle frame.
STM-15000U place to-cradle frame.
STM-15000U level adjustment of the cradle.
STM-15000U level adjustment of the cradle.
STM-15000U welding for fixing the position of the cradle.
STM-15000U welding for fixing the position of the cradle.
STM-15000U formwork lodgement.
STM-15000U formwork lodgement.
STM-15000U ditch to drain water and dirt.
STM-15000U ditch to drain water and dirt.
STM-15000U check the position of the cradle.
STM-15000U check the position of the cradle.
STM-15000U concreting-cradle frame completed.
STM-15000U concreting-cradle frame completed.
STM-15000U installation of the power unit.
STM-15000U installation of the power unit.
STM-15000U the final configuration.
STM-15000U the final configuration.
Customer completely satisfied.
Customer completely satisfied.


Яндекс цитирования