Equipment for maintenance checkup >> - Our work on installation of equipment for inspection

Installing Brake Stand STM-15000U in the Kherson region.

Customer: MOT station cars in the Kherson region.

Artists: Engineer on connection setups and equipment.

Type of work:

1. Installing brake tester STM-15000U.

2. Training.

Delivery date: November 2010.

 

Progress you can see in the pictures below.

If you want to view more photos - just click on it.

 

Frame-mounted cradle already. Concrete to settle and acquired the necessary strength. Ready to install brake tester STM-15000U.


STM-15000U frame-mounted cradle.

 

Repair in this room were planning to spend after installing all the equipment and dimensional elements of the heating network.


STM-15000U repair in the room.

 

Roller brake tester units STM-15000U already mounted in the frame-lodgement.

STM-15000U mounted roller assemblies.

 

Engineer connects the power cables for the brake tester STM-15000U.

STM-15000U connect the power cables.

 

To test the reliability and accuracy of installation of a brake stand is checked with the help of the main characteristics of metrological equipment that was included with the brake stand.


STM-15000U check the main characteristics.
 

Connecting the brake tester completed. Occurs first test vehicle check.

STM-15000U check the vehicle.

Photos: Installing Brake Stand STM-15000U in the Kherson region.

STM-15000U check the vehicle.
STM-15000U check the vehicle.
STM-15000U frame-mounted cradle.
STM-15000U frame-mounted cradle.
STM-15000U repair in the room.
STM-15000U repair in the room.
STM-15000U mounted roller assemblies.
STM-15000U mounted roller assemblies.
STM-15000U connect the power cables.
STM-15000U connect the power cables.
STM-15000U check the main characteristics.
STM-15000U check the main characteristics.