Equipment for maintenance checkup >> - Our work on installation of equipment for inspection

Installation of lodgement and installation of a brake stand STM-15000U for TC in Volyn

     Customer: ATP district center in Volhynia.
     Artists: installation teams (3 men) and engineer connection and installation.
     Type of works:  
     1. Mounting frame-Bottom stand for brake STM-15000U.
     2. Installing and connecting the brake stand STM-15000U.
     3. Training.
     Date: June 2012.
 
     Feature implementation of these operations was small width of the room where the equipment was installed.For customer design changes were made in the design of frame-Bottom.
 
     Course work you can see in the photographs presented below.
     If you want to view the photo details - just click on it. 
 
     The appearance of the room where it will be installed brake stand STM-15000U.

STM-15000U appearance of the premises.

     View room ATP before installing equipment.

STM-15000U of the premises.

     Mounting team prepared a place in frame-lodgement for STM-15000U.

STM-15000U site preparation under-cradle frame.

     Initial concrete frame bottom - poured concrete pad.
 
STM-15000U pouring the concrete pad.

     It gutter.
 
STM-15000U creates a drain.

     Concreting bottom completed.
 
STM-15000U concreting completed.

     Internal view of the room where it will be installed brake stand.
 
STM-15000U internal view of the room.
 
     Once concrete vidstoyavsya and finally gained the strength which the installation of roller assemblies brake stand STM-15000U.
 
STM-15000U installation of roller assemblies.
 
     Preparation roller brake assemblies stand for installation.
 
STM-15000U vertical exposure level.
 
     Elevation loader left roller unit.
 
STM-15000U the rise of the left roller assembly.
 
     Left roller brake assembly stand installed.
 
STM-15000U left roller unit is installed.
 
     Lifting the right unit brake stand.
 
STM-15000U the rise of the right unit.
 
     Setting the right roller brake unit stand STM-15000U.
 
STM-15000U installing right roller assembly.
 
    Two roller assemblies installed in the frame-lodgement.
 
STM-15000U installed two roller unit.
 
     Placing vertical level.
 
STM-15000U vertical exposure level.
 
     Placing vertical level.
 
STM-15000U vertical exposure level.

     Fixing locking elements from bottom bottom.
 
STM-15000U securing the locking elements.
 
     Installation of roller assemblies completed.
 
STM-15000U installation is complete.
 
     Computer brake stand with the software.
 
STM-15000U computer software.

     The first test vehicle.
 
STM-15000U first test car.
 
     Check the front axle.
 
STM-15000U check the front axle of the vehicle.
 
     Checking the rear axle.
 
STM-15000U check the rear axle of the vehicle.
 
     Checking the braking system of the car successfully passed.
 
STM-15000U check successfully completed.
 
     Passed test the braking system on the bus.
 
STM-15000U validation fails bus.

     View site ATP.
 
View territory TC.

Photos: Installation of lodgement and installation of a brake stand STM-15000U for TC in Volyn

View territory TC.
View territory TC.
STM-15000U appearance of the premises.
STM-15000U appearance of the premises.
STM-15000U of the premises.
STM-15000U of the premises.
STM-15000U site preparation under-cradle frame.
STM-15000U site preparation under-cradle frame.
STM-15000U pouring the concrete pad.
STM-15000U pouring the concrete pad.
STM-15000U creates a drain.
STM-15000U creates a drain.
STM-15000U concreting completed.
STM-15000U concreting completed.
STM-15000U internal view of the room.
STM-15000U internal view of the room.
STM-15000U installation of roller assemblies.
STM-15000U installation of roller assemblies.
STM-15000U training units for installation.
STM-15000U training units for installation.
STM-15000U the rise of the left roller assembly.
STM-15000U the rise of the left roller assembly.
STM-15000U left roller unit is installed.
STM-15000U left roller unit is installed.
STM-15000U the rise of the right unit.
STM-15000U the rise of the right unit.
STM-15000U installing right roller assembly.
STM-15000U installing right roller assembly.
STM-15000U installed two roller unit.
STM-15000U installed two roller unit.
STM-15000U vertical exposure level.
STM-15000U vertical exposure level.
STM-15000U vertical exposure level.
STM-15000U vertical exposure level.
STM-15000U securing the locking elements.
STM-15000U securing the locking elements.
STM-15000U installation is complete.
STM-15000U installation is complete.
STM-15000U computer software.
STM-15000U computer software.
STM-15000U first test car.
STM-15000U first test car.
STM-15000U check the front axle of the vehicle.
STM-15000U check the front axle of the vehicle.
STM-15000U check the rear axle of the vehicle.
STM-15000U check the rear axle of the vehicle.
STM-15000U check successfully completed.
STM-15000U check successfully completed.
STM-15000U validation fails bus.
STM-15000U validation fails bus.